What the client wanted to achieve
As an existing client where we had installed over 3000m2 of 6mm polyurethane screed the requirements here were clearly understood, as a specialist oil manufacturer and distributor we were asked to finish off the last area in this facility, knowing that oil contamination was an issue as previous and with the understanding that the goods out area was heavily trafficked and challenged we kept to the previous processes and specification, here is what we did.
The solution
Over the years various finishes had been installed to this area so the challenge was to prepare the surface as intense as we could without causing too much damage, as previous we used a Rotamat and a Skanmaskin triple headed grinder, after 2 days of preparation we were happy with the surface, once some minor repairs had been completed we installed an oil tolerant primer to the area and allowed to cure overnight, following the next day inspection we were ready to install the polyurethane screed system at 6mm in thickness, floor chasing took place using diamond tip blades to ensure the material gripped the substrate which is a basic requirement for this type of system but not always followed.
The 6mm screed was installed over 3 days giving a hard wearing, chemical resistant finish with excellent slip resistant properties, a further heavy based aggregate (1-2mm) was blinded into the roller shutter door entrance to give additional grip for the fork lifts trucks in with wet conditions.
Common questions
Why use 6mm PU screed in an oil manufacturing plant?
A 6mm polyurethane screed gives a hard-wearing, chemically resistant floor with excellent slip resistance, which suits demanding areas where oil contamination is a risk. This Wolverhampton oil manufacturer had already had over 3,000m2 installed, and the same specification was used for its heavily trafficked goods-out area.
What primer is used on oil-contaminated concrete?
An oil-tolerant primer is used where oil contamination has been an issue. On this project the oil-tolerant primer was applied after preparation, left to cure overnight and inspected the next day before the 6mm polyurethane screed was installed over three days.
Why are chases cut into the floor before laying PU screed?
Chasing the floor with diamond tip blades helps the screed grip the substrate. Here the surface had received various earlier floor finishes, so it was prepared as intensively as possible without excessive damage using a Rotamat and a Skanmaskin triple-headed grinder over two days, with minor repairs and chasing completed before priming.
How can forklift grip be improved at roller shutter doors?
Blinding a heavier aggregate into the screed at entrances adds grip. At this plant a heavier 1-2mm aggregate was blinded into the roller shutter door entrance to give forklift trucks more grip in wet conditions, while the rest of the 692m2 goods-out area received the standard 6mm polyurethane screed.